Arriving at Blaenau Ffestiniog on the Lancaster Railtours excursion from Carnforth. The slate-coloured landscape is testament to hundreds of years of mining. 1280x960 SRF2005_0625_130230AA.JPG 2005-06-26 00:00:00 |
The old LNWR station at Blaenau Ffestiniog, closed in 1984 but still standing. 1280x960 SRF2005_0625_130402AA.JPG 2005-06-26 00:00:00 |
Ffestiniog Railway 10 "Merddin Emrys", on test after a boiler overhaul and the provision of two new power bogies. The loco had been turned out to work the 13:20 Blaenau Ffestiniog - Porthmadog special "Lancaster Railtours" service. 1224x880 SRF2005_0625_130454AA.JPG 2005-06-26 00:00:00 |
Coaches fill to bursting point with participants on the railtour. 1280x960 SRF2005_0625_131206AA.JPG 2005-06-26 00:00:00 |
The driver of "Meryddin Emrys" stands, sideways-on, in the cab, which is positioned between the two boilers of the double Fairlie locomotive. Whilst making the sighting of the track ahead much easier, it is necessary to make a sharp movement to stay inside the loading gauge at any limited-clearance point. 1280x960 SRF2005_0625_132238AA.JPG 2005-06-26 00:00:00 |
A rockface, pinned by bolts, juts over the loco as "Meryddin Emrys" heads downhill toward Porthmadog. 1280x960 SRF2005_0625_132316AA.JPG 2005-06-26 00:00:00 |
One of the new "Ffestiniog" distant signals, on the approach to Tanygrisiau. 1280x960 SRF2005_0625_132352AA.JPG 2005-06-26 00:00:00 |
"Blanche" waits at Tanygrisiau with a service train whilst the special approaches the island platform. 1280x960 SRF2005_0625_132424AA.JPG 2005-06-26 00:00:00 |
Signals at Tanygrisiau. Of a special "Ffestiniog" design, they are nevertheless electrically powered. They are electrically powewred, and show aspects through a series of holes in the circumference of the signal disc. 1280x960 SRF2005_0625_132530AA.JPG 2005-06-26 00:00:00 |
On leaving Tanygrisiau, the line takes a new course, away from the original route, in order to bypass the Moelwyn Resevior, built over the line of route by the CEGB in the years when the line was not operating. The railway had not, however, closed, and compensation had to be eventually paid by the electricity generating company. 1280x960 SRF2005_0625_132646AA.JPG 2005-06-26 00:00:00 |
On the other side of the resevior, the line describes a complete loop, designed to drop down the hillside quickly. The original route is rejoined, at the now-deserted intermediate station of Dduallt. 1280x960 SRF2005_0625_133320AA.JPG 2005-06-26 00:00:00 |
Minffordd station. The Cambrian Railway station is seen from the Ffestiniog sttaion, with the transfer sidings where slate for exporet was once transhipped 1200x900 SRF2005_0625_141720AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_142512AA.JPG 2005-06-26 00:00:00 |
960x1280 SRF2005_0625_143714AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_143910AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_144250AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_144350AA.JPG 2005-06-26 00:00:00 |
960x1280 SRF2005_0625_144606AB.JPG 2005-06-26 00:00:00 |
960x1280 SRF2005_0625_144726AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_145434AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_151032AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_151038AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_151048AB.JPG 2005-06-26 00:00:00 |
1227x875 SRF2005_0625_151114AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_151518AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_152308AA.JPG 2005-06-26 00:00:00 |
1226x891 SRF2005_0625_152800AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_153030AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_153054AA.JPG 2005-06-26 00:00:00 |
1211x919 SRF2005_0625_153108AA.JPG 2005-06-26 00:00:00 |
960x1280 SRF2005_0625_153140AB.JPG 2005-06-26 00:00:00 |
960x1280 SRF2005_0625_154020AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_154308AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_155010AA.JPG 2005-06-26 00:00:00 |
1207x915 SRF2005_0625_155418AA.JPG 2005-06-26 00:00:00 |
1280x960 SRF2005_0625_160902AA.JPG 2005-06-26 00:00:00 |
| | | |